The project involved the comprehensive replacement of the sheathing of the 22x16x5m hall, originally built in 2015. The aim was to upgrade the facility and improve thermal insulation and airtightness properties.
The new elements included:
Wymiary:
The main challenge of the project was to modernise the existing structure by replacing the sheathing while retaining the 2015 structural layout and incorporating the changes made in 2016 – particularly with regard to the dimensions of the gates.
The installation of a new thermal insulation soffit (ALUFOX) and the re-tensioning of the PVC roof on the updated strips required particular precision.
Ultimately, the hall gained a modern look, increased airtightness and thermal efficiency, while maintaining continuity of use.
The client expected a comprehensive solution that included:
Construction with solid covering
Top quality materials
Weather resistance
Compliance with applicable standards
To facilitate the pricing of a customized product for a specific solution, we have prepared the POLPLAN configurator.
With it, you can easily and intuitively configure your order, allowing us to price its execution more accurately. No advanced skills are needed; the configurator is simple to use.
Write to us
We will respond and prepare a detailed quote for you within a maximum of 3 business days.