The main challenge of the project was integrating a 3 m non-standard bay with the main 5 m structural spacing, while maintaining structural continuity and the tightness of the membrane cladding. Another key aspect was ensuring effective drainage of condensation from the inner liner surface, which was achieved by implementing a dedicated foil system with drainage pipes.
